Scope

CEC provided structural engineering services with detailed construction documents.

DESCRIPTION

27,600 sq ft, single-story, steel-framed office space supported on top of four-story concrete parking garage. No exterior bracing used to allow for maximum window view. Steel-framed wall extending above roof level without kneebracing back to the roof structure. This building was completely designed by another firm, cec was hired to redesign the structure and within a two week time period to maintain the original schedule.

Testimonials

Having being in this industry for last 37 years, I can say that CEC is a class above the rest when it comes to solving complex, practical structural problems.
Hubert McGee
President
McGee's Mobile Crane, Inc

Client

STEELQUEST, INC STEEL FABRICATORS

Project

DELTA RESERVATION CENTER

CONTRACTOR

AL NEYER, INC.

Location

DOWNTOWN CINCINNATI, OHIO

Project Savings

$120,000.00